Firing on All Cylinders : An Update based on a May 2018 Visit to IRC’s Teal & Goongarrie Projects
ERA visited a number of Intermin Resources Ltd’s (IRC’s) Kalgoorlie to Goongarrie Projects in May 2018, particularly Teal (and Jacques-Peyes), Goongarrie Lady, Anthill, Blister Dam (and its flaky visible gold), Baden Powell & Olympia as shown in Figure 1a. We glanced at the location of Crake, which reported those spectacular intercepts of 28m @ 3.3g/t (from 56m incl 4m @ 15.1g/t), and 20m @ 4.6g/t (incl 8m @ 8.4g/t).
Intermin has a target route to become a ~100kozpa gold producer with a >5 year mine-life, by using the stepping stones of small mining projects (SMPs) to self-finance its exploration, and has displayed its capability to achieve that with its very successful oxide mining of Teal realising ~3.5koz higher gold production at 21.84koz, mostly from ~13% higher ore tonnes mined and 5% higher recoveries of 93.6%, which increased the expected revenue of $29.3m by 24% or $7.2m to $36.5m. The actual profit (>$8m?) is expected to be finalised in SQ 2018, with its operational JV partner claiming alternative cost variations.
Other Key Points: :
The SMP over Teal has been extremely successful, with a larger resource mined, better recoveries and higher profits than expected, and has increased IRC’s confidence in advancing the next 3 prospects in the pipeline (Goongarrie Lady, Jacques-Peyes, and Anthill) through to mining, treatment and profitability.
Apart from Goongarrie Lady, the proposed production pipeline order of the projects/prospects is not “set in stone” and could change, especially if one prospect infers potentially better return characteristics, as illustrated by the Crake discovery joining the mix.
The results from the feasibility study on Goongarrie Lady were reported on 28 June 2018, with an expected free cashflow return of $5 to $7m over 7 months, possibly pre-strip mining in MQ 2019.
The Crake discovery in the Binduli tenements resulted from Evolution ending its JV farm-in and handing control back to Intermin who were then able to drill/explore where they wanted to, with IRC’s first target (Crake) being on strike of Janet Ivy (where Zijin is mining & paying a 50c/t royalty).
There are a number of projects making steady progress such as Blister Dam and Baden Powell/Olympia, and the tenement package is increasing with Ida and Lakewood in Figure 1a.
In addition to the JVs mostly involving other companies farming-in, as shown in “blue” in Figure 1b, Intermin has its Richmond Vanadium JV in QLD, which has also been making steady progress.